vehicles for maintenance and repair of city roads

Garbage container

(Not yet rated)
Загрузка ... Loading ...
Garbage container

Their performance depends on the duration of the loading operations associated with the replacement of containers at the yard areas. Therefore it is necessary to take measures to reduce cycle time for loading and unloading operations. This is primarily ensured by the proper arrangement of containers and vehicles when they are loaded.

Containers should be placed on the paved area in a row. Entrance to the site should be free and let the garbage containers and stop at the right and left sides. It is desirable that the machine is held at the same horizontal position and placed so that the unloading and loading of empty containers filled place with minimal maneuvering a crane. Manage the truck crane as needed thriftily in order to prevent attacks on the container platform and other containers. In this case must use the remote control so that when any movement is not a container crane located above it. No need to lift the container to a height greater than that required for its unloading or loading. In order to comply with proper weight distribution when driving cars on the route of unloading and loading of containers is recommended to begin replacing a number of empty containers, located directly behind the cab. It should also comply with this order of loading and unloading, when the number of loaded containers in longitudinal rows will not differ by more than one.

Filled trash containers to a machine, the next on a given route, the choice of which to determine the minimum distance to move to places for containers and perform all of the above recommendations relating to the order of loading and unloading of containers.

When emptying containers in places of disposal must carefully monitor the position of the platform and the crane, preventing falls and hits her in the corner.

in this case should be downloadable on the side of the platform and operate a crane with a remote control that is installed behind the cab.

Garbage container provides loading-unloading operations, as a rule, in the courtyards, in the immediate vicinity of the houses, so noise reduction engine speed should not exceed 1500 rev / min.


Tags: , ,

We recommend to look

Leave a comment